FW V06.XX/HAFM SW V08.02.00 HP StorageWorks SAN High Availability Planning Guide (AA-RS2DD-TE, July 2004)

Table Of Contents
171SAN High Availability Planning Guide
5
Configuration Planning Tasks
This chapter describes configuration planning tasks to be performed before
installing the High Availability Fabric Manager (HAFM) server and one or more
Director 2/64s, Director 2/140s, Edge Switch 2/12s, Edge Switch 2/16s, Edge
Switch 2/24s, or Edge Switch 2/32s in a storage area network (SAN)
configuration.
Note: The Edge Switch 2/12 is not supported by the HAFM appliance.
The following planning tasks are described in this chapter.
Task 1: Prepare a Site Plan, page 173
Task 2: Plan Fibre Channel Cable Routing, page 178
Task 3: Consider Interoperability with Fabric Elements and End Devices,
page 179
Task 4: Plan Console Management Support, page 180
Task 5: Plan Ethernet Access, page 182
Task 6: Plan Network Addresses, page 183
Task 7: Plan SNMP Support (Optional), page 185
Task 8: Plan E-Mail Notification (Optional), page 186
Task 9: Establish Product and HAFM Appliance Security Measures,
page 187.
Task 10: Plan Phone Connections, page 188
Task 11: Diagram the Planned Configuration, page 189
Task 12: Assign Port Names and Nicknames, page 190
Task 13: Complete the Planning Worksheet, page 191
Task 14: Plan AC Power, page 195