HP StorageWorks 4400 Scalable NAS File Services wiring diagrams (AN595-96008, October 2009)

Ethernet wiring
ProCurve
System NIC portSystem
VLAN 2VLAN 1
Port 1
Embedded NIC
1
DL360 G6 Server 1
Port 13iLO 2
Port 2
Embedded NIC
1
DL360 G6 Server 2
Port 14iLO 2
Port 3
Embedded NIC
1
DL360 G6 Server 3
Port 15iLO 2
Port 4
Embedded NIC
1
DL360 G6 Server 4
Port 16iLO 2
Port 5
Embedded NIC
1
DL360 G6 Server 5
Port 17iLO 2
Port 6Port 10*Admin PortEVA ABM
Port 7Port 11*
Controller 1, Port
1
Fibre Channel Switch
1
Port 8Port 12*
Controller 2, Port
1
Fibre Channel Switch
2
* Optional second port to allow access from the customer's network.
Requires IP address changes on both the hardware device and within
the cluster configuration.
Fibre Channel wiring
NOTE:
Servers are numbered 1 through 5 as labeled in the above
figure.
SAN Switch
2
SAN Switch
1
System FC
port
System
1Right
DL360 G6 Server 1
1Left
2Right
DL360 G6 Server 2
2Left
3Right
DL360 G6 Server 3
3Left
4Right
DL360 G6 Server 4
4Left
5Right
DL360 G6 Server 5
5Left
Page 5