HP Data Protector software interaction with deduplication enabled replication
33
Note: The user added to the Run as field must also be a user in the HP Data Protector admin
group.
11. Select the Schedule tab to continue with the configuration.
12. Enter the schedule details (see Figure 19) such as the reccurrence interval and start time of
interval according to your import-cartridge planning schedule.
13. Click on Advanced to modify the repetition rate of the task and duration.
14. Save the newly created task.
Note: Add a task for each configuration file you have created.
Note: When you plan your import schedule take into consideration potential replication black-out
windows on your replication devices. HP recommends that copies are scheduled on a different
day and/or time window from other backup activities. Also consider import permission windows
as configured in the script import configuration file. Import devices might be busy because of other
scheduled jobs such as object copy jobs.
After creating all necessary jobs you are recommended to verify that they execute successfully.
To do so, right-click on each job entry in the scheduler window and select Run from the context
menu.
To verify the execution status of every tested job, open the log file of the scheduler and make sure
all executed jobs have an exit code (0).
Select Advanced in the menu list. Select View Log.
Figure 20 Windows scheduler log file