HP XP7 Replication Manager User Guide (TK981-96013, May 2014)

Immediate execution
Scheduled execution
Execution using CLI
NOTE:
If Replication Manager is not running when a task is scheduled to execute, the task will be executed
as follows:
For tasks
with
an execution interval specified, the task is run at the next execution time after startup
occurs.
For tasks
without
an execution interval, the task is run immediately after startup occurs.
For example, if you create copy groups A and B, which constitute a multi-target configuration, and
copy groups C and D, which constitute a cascade configuration, Replication Manager generates two
tasks, each on a copy group basis, for each workflow.
TIP:
For situations such as when storage system resources and host applications are managed by different
administrators, the work status at any point during copy pair creation by a wizard can be saved as
a workflow and passed from one administrator to the next. In this case, a new task is generated when
the wizard finishes and the saved workflow is overwritten.
Managing pair life cycle174