HP StorageWorks Application Recovery Manager Administrator's Guide (T4395-96004, February 2008)
Backup
Scheduling the Backup
Chapter 3 49
Scheduling the Backup
For more detailed information on scheduling, refer to the online Help
index keyword “scheduled backups”.
To schedule a backup specification, perform the following steps in the
Application Recovery Manager GUI:
1. In the HP StorageWorks Application Recovery Manager GUI,
switch to the Backup context.
2. In the Scoping Pane, expand Backup, then Backup Specifications.
Click MS Volume Shadow Copy Writers.
A list of available backup specifications is displayed in the Results
Area.
3. Double-click the backup specification you want to schedule and click
the Schedule tab to open the Schedule property page.
4. In the Schedule property page, select a date in the calendar and click
Add to open the Schedule Backup dialog box.
5. Specify Recurring, Time options, and Recurring options.
Figure 3-7 Scheduling a Backup