HP Apollo a6000 Chassis Maintenance and Service Guide
Removal and replacement procedures 21
Removal and replacement procedures
Required tools
You need the following items for some procedures:
• T-10 Torx screwdriver
• T-15 Torx screwdriver
Preparation procedures
To access some components and perform certain service procedures, you might need to perform one or more
of the following procedures:
• Power down the server tray ("Power down the server" on page 21)
• Remove the server tray ("Remove the server" on page 22)
• Remove the chassis from the rack (on page 22).
• Install the chassis into the rack (on page 23).
Power down the server
Before powering down the server for any upgrade or maintenance procedures, perform a backup of critical
server data and programs.
IMPORTANT: When the server is in standby mode, auxiliary power is still being provided to the
system.
To power down the server, use one of the following methods:
• Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the server enters standby
mode.
• Press and hold the Power On/Standby button for more than 4 seconds to force the server to enter
standby mode.
This method forces the server to enter standby mode without properly exiting applications and the OS.
If an application stops responding, you can use this method to force a shutdown.
• Use a virtual power button selection through iLO.
This method initiates a controlled remote shutdown of applications and the OS before the server enters
standby mode.
Before proceeding, verify the server is in standby mode by observing that the system power LED is amber.










