Installation Guide, Fifth Edition - HP 9000 rp8420 Server

Chapter 2
Installation
Using the RonI Model 17000 SP 400 Lifting Device
30
Step 3. Insert the lifter forks between the cushions.
Figure 2-5 Positioning the Lifter to the Pallet
Step 4. Carefully roll the lift forward until it is fully positioned against the side of the server.
Position the lifter forks at
these insertion points.