Installation Guide, Fifth Edition - HP 9000 rp8420 Server

Chapter 2
Installation
Cabling and Power Up
77
Select PCI card slot
Install PCI card
Verify installation
Route cables using the cable
management arm
Install other peripherals (if
required)
Perform visual inspection and
complete installation
Set up network services (if
required)
Enable iCOD (if available)
Final inspection of circuit boards
Final inspection of cabling
Area cleaned and debris and
packing materials disposed of
Account for tools
Dispose of parts and other
items
Make entry in Gold Book
(recommended)
Customer acceptance and
signoff (if required)
Table 2-5 Factory-Integrated Installation Checklist (Continued) (Continued)
PROCEDURE IN-PROCESS COMPLETED