Installation Guide, Fifth Edition - HP 9000 rp8420 Server
Chapter 2
Installation
Receiving the Server Cabinet
25
Step 6. Remove the six bolts from the base attaching the rack to the pallet.
Figure 2-3 Preparing to Roll Off the Pallet
WARNING Use caution when rolling the cabinet off the ramp. A single 4-cell server in
the cabinet weighs approximately 400 lb. To avoid a safety hazard, be sure
that the leveling feet on the cabinet are raised before you roll the cabinet
down the ramp, and any time you roll the cabinet on the casters. It is
strongly recommended that two people control rolling the cabinet off the
pallet.
Step 7. Attach the ramps to the pallet.
Step 8. Carefully roll the cabinet down the ramps.
Step 9. Position cabinet in final location.
Step 10. Remove pallet , ramps and any other packing material from work area.










