
2 of 2
Figure 1. Assembling the Pedestal Frame to the Server
6. Complete the rack to pedestal conversion by performing all of the steps required to power on the server detailed in
the Installation Guide provided with your server.
Frame Assembly
Frame Assembly
Center Tubes