HP 4x00/6x00/8x00 Enterprise Virtual Array Updating Product Software Guide (XCS 6.240)

Table 5 XCS 6.240 Pre-upgrade task checklist (continued)
Task completeTask
“Preparing an HP Continuous Access EVA environment for upgrading” (page 35)
Time required: Varies depending on replication configuration
When to perform: As close as possible to the upgrade
“Saving storage system configuration information” (page 37)
Time required: 10–15 minutes
When to perform: As close as possible to the upgrade
Task checklist 39