3PAR Replication Adapter 4.0.1 for VMware vCenter Site Recovery Manager Implementation Guide

27
Failover
HP 3PAR Replication Adapter 4.0.1 for VMware Site Recovery Manager Implementation Guide
After a failover, the recovery site can be viewed as the new protected site.
10.1 Procedure after Failover
After failover completes from the VMware vCenter Site Recovery Manager and the newly-
recovered site (original protected site) of the storage system is still available, the Remote Copy
link can be resumed with the following steps:
1 Connect to the newly-protected site of the HP 3PAR Storage System and issue the
showrcopy groups <groupname> command to get the current role of the target Remote
Copy volume group.
2 If the Remote Copy volume group role is Primary, synchronization can be resumed
between two the sites by issuing the startrcopygroup and syncrcopy commands on the
newly-protected site of the HP 3PAR Storage System.
3 If the Remote Copy volume group role is Primary-Rev, synchronization can be resumed
between the two sites by issuing the setrcopygroup recover <groupname> and
syncrcopy commands on the newly-protected site of the HP 3PAR Storage System.