HP StorageWorks ESL9000 series tape library pre-installation site survey (April 2003)

Site Survey
14 HP StorageWorks ESL9000 Series Tape Library Pre-installation Site Survey
Using the grid on the following page, draw a map showing the route the library
will follow from the receiving dock to the installation site. Note any potential
obstacles such as steps, ramps, carpet, thresholds, elevator size and weight ratings,
raised floor weight ratings, and rough surfaces. Confirm the installation site
selection is appropriate for the size and weight of the library.
16.
Has qualified application backup software been installed on the hosts?
17. If spares have been ordered, is spares storage space available?
18. Has access to the customer site been provided to complete this survey?
Question
Site Ready?
Yes No