HP StorageWorks Secure Key Manager Pre-installation survey and checklists, for connecting to ETLA libraries (AJ087-96012, November 2008)
Table Of Contents
- HP StorageWorks Secure Key Manager Pre-installation survey and checklists, for connecting to ETLA libraries
- SKM pre-installation survey
- Sourcing the SKM security officer (SO) role and ensuring installation support
- Designing the cluster, identifying any cross-geography requirements
- Obtaining a static IP address for the SKM
- Identifying the ETLA libraries and number of LTO4 drives to be used for encryption
- Addressing physical installation and security requirements for the SKM
- Designing a backup strategy for keys and audit logs
- Determining the appropriate key generation policies
- Meeting minimum ETLA hardware and firmware requirements
- Configuring accounts for each ETLA library
- Enrolling the ETLA libraries with the SKM
- SKM pre-installation checklists
- SKM pre-installation survey

Table 6 SKM data
Secure locatio
n is prepared?
Rack space has been identified?
Rack(s) is/are on the list of supported racks?
Rack(s) contai
nsufficient power outlets (2 per
node)?
For appliance 1
Admin password defined?
Cluster password defined?
Local CA and Certificate information:
Certificate Authority (CA) name
CA common name
Server certificate name
Organization name
Locality name
State or province name
Country name
8