User guide

b
. Install the FBWC capacitor pack holder into the server.
11
.
Install the access panel on page 20.
12
. Install the server into the rack (
Installing the server into the rack on page 35).
13. Connect each power cord to the server.
14
. Connect each power cord to the power source.
15
.
Power up the server on page 18.
Controller options 53