Installation guide

Connectors, LEDs, and Switches
7. Power up the server blade:
Press the Power On/Standby button on the front of the server blade.
Use the virtual power button feature in the iLO remote console.
8. Wait for the POST message that prompts you to change the switch setting:
Maintenance switch detected in the "On" position.
Power off the server and turn switch to the "Off" position.
9. Repeat steps 1 through 3.
10. Change position 6 of SW4 to off.
11. Repeat steps 5 through 7.
IMPORTANT: When the server blade boots after NVRAM is cleared, a delay of up to 2 minutes is
normal. During this delay, the system appears non-functional. Do not attempt any procedures during the
delay.
HP ProLiant BL20p Generation 2 Server Blade Maintenance and Service Guide 4-13