Technical data
2-2 9050 Environmental/Installation/PM
Installation
1.
Unpack the computer.
2.
Using the information
in
the "Line Voltage
and
Fusing" subsection of the Installation
and
Configuration manual, ensure the line voltage,
and
ground, are correct
and
within tolerance.
3. Ensure the line voltage switch
is
set correctly: up
for
110
Vac;
down for
220
Vac.
4.
Ensure the fuse
is
correct for the voltage being applied to the system you are installing.
5.
Remove the shipping spacers
in
the
110
card cage.
6. Refer to the
"Switch Settings"
and
"Interconnections" sections
in
the Installation
and
Con-
figuration manual, then set the switches
and
install each of the interface driver cards.
7.
Install the peripherals. Refer to the installation instructions that are shipped with the peripher-
als for installation information.
8.
Using the information
in
the self-test subsection of the Installation
and
Configuration manual,
apply power to the computer
and
ensure that
it
passes
all
the self tests.
9.
Load the HP-UX Operating System. Refer to the "System Administrator Manual" to load
and
run the system operating software. Ensure
all
self-tests are successfully passed.
10. Verify correct system operation by using the System Functional Test
in
the HP-UX Operating
System
and
ensure that the computer
is
operating correctly with the systems peripherals.
Preventive Maintenance
There
is
no
regularly scheduled preventive maintenance. Clean the
filter
screen when required
for
good air
flow.