Specifications
10-19
Cisco NAC Appliance - Clean Access Manager Configuration Guide
OL-28003-01
Chapter 10 Cisco NAC Appliance Agents
Cisco NAC Agent
Figure 10-26 Link Distribution Requirement Example
18. Clicking Cancel at this stage stops the login process.
19. For each requirement, the user needs to click Skip to proceed after completing the action required
(Update, Go To Link, Download). The Cisco NAC Agent again performs a scan of the system to
verify that the requirement is met. If met, the Agent proceeds to the next requirement configured for
the role.
Note If a requirement is Optional, when the user clicks Skip in the Cisco NAC Agent for the optional
requirement, the next requirement dialog appears or the login success dialog appears (Figure 10-28) if
all other requirements are met.
20. If a Network Policy page was configured for the role, the following dialog will appear
(Figure 10-27) after requirements are met. The user can view the “network usage policy” HTML
page (uploaded to the CAM or external server) by clicking the Network Usage Terms &
Conditions link. The user must click the Accept button to successfully log in.