Installation manual

Table Of Contents
240 Volt AC Power Sequencer
300-1264
Sherwood Enterprises
Outlet Side
Control Side
Notes
Requires a Blue, IEC 309, 2-Pole, 3-Wire, 32A, 250V AC receptacle.1.
Any conversion to the Data Center Cabinet, including replacement of the AC Power Plug or AC
Power Sequencer, voids all safety agency approvals.
2.
The Switched 2 output comes on after a 20 second delay.3.
The 300-1264 replaced 370-1156-03 in February 1996.4.
References
Sun 56-inch Expansion Cabinet Installation Manual, 800-5936-18.1.
Sun 56-inch Expansion Cabinet Service Manual, 800-6371-17.2.
Last updated: December 2, 1996