230 Volt AC Power Sequencer
370-1155-02
Sherwood Enterprises
Outlet Side
Control Side
Notes
Requires AC outlet NEMA L6-30R, 30A, 250V.1.
Any conversion to the Data Center Cabinet, including replacement of the AC Power Plug or AC
Power Sequencer, voids all safety agency approvals.
2.
The Switched 2 output comes on after a 20-second delay.3.
References
Sun Full-Height Rack System Installation Manual, 800-1677.1.
Sun Rackmountable Fileservers Installation Manual, 800-1676.2.
Sun 900 Mbyte Disk Drive Installation Manual, 800-1036.3.
Sun 56-inch Data Center Cabinet and Data Center Expansion Cabinet Installation Manual,
800-3242.
4.
Sun4/II: Power - Sherwood Enterprises 230 Volt AC Power Sequencer