Installation manual

Table Of Contents
230 Volt AC Power Sequencer
370-1027 370-1155
Pulizzi Engineering
PC874
Pulizzi Engineering
PC874
Outlet Side
Control Side
Notes
Requires AC outlet NEMA L6-30R, 30A, 250V.1.
Any conversion to the Data Center Cabinet, including replacement of the AC Power Plug or AC
Power Sequencer, voids all safety agency approvals.
2.
The Switched 2 output of 370-1127 comes on after a 5-second delay.3.
The Switched 2 output of 370-1155 comes on after a 20 sec delay.4.
Sun4/II: Power - Pulizzi Engineering PC874C and PC874D 230 Volt AC Power Sequencer
http://lios.apana.org.au/~cdewick/sunshack/data/feh/1.4/wcd00006/wcd006a0.htm (1 von 2) [25.04.2002 15:59:14]