Service and Maintain

Periodic maintenance 61
Periodic maintenance
Periodic maintenance overview
Perform periodic inspections on the components in this section to be sure that the HP POD 20c continues to
perform within the designed parameters.
Qualified personnel
Qualified personnel are identified as personnel who are:
Properly trained in the operation and maintenance of the HP POD 20c
Customer-authorized to conduct maintenance activities
Qualified personnel can be:
HP personnel
Agents for HP
Site maintenance personnel
Cooling system
Component to be inspected Task Frequency Capable Party
Air filters
Inspect and replace as necessary As needed (at
least quarterly)
Qualified personnel
Air filter differential pressure
sensor
Inspect and replace as necessary Annually Qualified personnel
Cooling system leak check
Verify that there is no visible
chilled water leakage from the:
Heat Exchanger
CWS piping
CWR piping
If a leak is detected, see "Leak
detection (on page 62)."
Quarterly Qualified personnel
Condensate drain pans
Inspect and verify that the:
Pans are free of debris
Pans have no leaks
Leakage detectors are in
proper position
Clean pans as necessary
Quarterly Qualified personnel
Condensate drain pan sensors
Inspect, test, and replace as
necessary.
If a leak is detected, see "Leak
detection (on page 62)."
Quarterly Qualified personnel