Getting Started Guide

Appendix B: Preparing for delivery 30
Item Description Initial
10
Verify that the site location has clearances for the HP POD 20c installation, including any
permanent structures, such as fences, walls, vestibules, and buildings.
11
Verify that all utilities, overhead and underground, are identified to maintain required
clearance.
12
Verify that there is adequate clearance around the HP POD 20c for door operation,
installation, and maintenance equipment.
13
Verify that the site location and site pads are marked for any transformer, external
switchboard, generators, and powerhouses.
14
Verify that the site has provisions for proper grounding and that the site location includes a
grounding electrode system.
15
Verify that the site location has adequate lighting for the HP POD 20c installation.
16
Verify that a truck and equipment staging areas are identified.
17
Verify the location for the fuel tanks for generators, powerhouses, and other equipment, if
applicable.
18
Verify the locations for cranes off-loading and operation during HP POD 20c installation.
19
Verify site access and clearances for equipment, including the crane and forklifts. A clear
path to the site must be maintained with clearance for all gates, headers, utility lines, and so
on.
20
Verify that the locations for storage and trash disposal are identified.
21
Verify that the safety equipment is planned for and in place in accordance with the
customer’s site safety program.
22
Verify the site interfaces and locations which connect to the fire alarm, access control system,
and communication system to the HP POD 20c to ensure that the POD can be properly
connected to the site BMS.
23
Verify that proper disposal methods are used for existing or potentially contaminated and/or
hazardous materials.
24
Verify the availability of security systems or equipment, including site fences, which are
required after construction.
25
Verify the availability of temporary facilities associated with the relocation of existing
services and operations.
26
Verify that all work relating to soil testing, removal, and site remediation is complete.
27
Verify that a temporary or permanent load bank is available, if applicable.
28
Verify the location of the EPO system external to the powerhouses, if applicable.
29
Verify the location of the remote electronic monitoring system.
30
Verify that tie-downs and other Authority-required facilities for the HP POD 20c and power
containers are complete at least one week prior to arrival of HP-provided equipment.
General Water Supply
Item Description Initial
1
Verify that the site drainage is complete, and the HP POD 20c is not in a drainage path or
flood prone area. HP recommends placing the HP POD 20c on a raised site pad to prevent
water from entering the HP POD 20c.
2
Verify that the humidification water quality meets or exceeds these standards, which are
essentially drinking water standards.
3
Verify the humidification water supply isolation valve is installed for each POD.
Chilled Water Supply
Item Description Initial
1
Verify the chilled water supply and return headers are accessible, are in the appropriate
location, and are 80 cm (3 in) in diameter.