Getting Started Guide

Site plan requirements and actions 25
Additional structures
If a customer-provided vestibule or other structure is installed and connected to the HP POD 20c, the following
specifications must be maintained:
To protect the HP POD 20c and ensure a waterproof barrier, flashing must be installed to the exterior
of the HP POD 20c in the location where the other structure is attached.
Access landings might be required to maintain the required access to the HP POD 20c electrical panels.