Instruction Manual

Step 6 Signal Communication (Connection of communication box is mandatory)
Label
Meter (485A, 485B)
BMS (CANH, CANL, 485A, 485B)
DRM (D1/5, D2/6, D3/7, D4/8, REF, COM)
DI (IN-, IN+)
Parallel (DI IN+, DI IN-,CANH, CANL, 485A_1,
485B_1, 485A_2, 485B_2)
120 Ohm (ON, OFF)
DO1 (NO1, COM1)
DO2 (NO2, COM2)
Description
For the Smart Meter.
For Li-ion battery communication via CAN or RS485.
For external Demand Response Enabling Device.
Dry-contact input of external bypass contactor.
For parallel operation.
120 Ohm termination resistor for parallel operation.
Dry-contact output. The DO1 will control the bypass
contactor under certain logic.
Dry-contact output. The DO2 can be set to one of the
functions as follows: Earth Fault Alarm, Load Control,
Backup Load Smart Control, and Generator Control.
Hybrid Inverter Quick Installation Guide
8-485A_2
7-485B_2
2
6-485A_1
5-485B_1
4-CANL
1
3-CANH
2-DI IN-
1-DI IN+
8-NC
8-485B
8-485A_2
7-NC
7-485A
7-485B_2
6-NC
6-NC
6-485A_1
5-485B
5-CANL
5-485B_1
4-485A
4-CANH
4-CANL
3-NC
3-NC
3-CANH
2-NC
2-NC
2-DI IN-
1-NC
1-NC
1-DI IN+
MRDID
Para1
120 Ohm
ON OFF
4 6 8
IN- D2/6 D4/8 REF
1OD753
21MOC7/3D5/1D+NI
NO1 COM1
2araPSMBreteM
DO2
1 2
NO2 COM2
09