Installation Guide
4
5
6
Once cut, remove the balusters by slowly 
pushing them back and forth until the nails are 
worked loose.
Remove the existing nails from the rail and base 
using pliers and apply wood ller to the nail 
holes if necessary.
Now is a good time to layout your new iron 
balusters against the rail to make sure your 
pattern and spacing are correct.
Once proper spacing (refer to your local building code) 
has been established, mark your rail and cap with a 
pencil where you will drill your holes according to the 
diameter of your baluster. Drill 1/4 inch deep into the 
cap and 1-1/2 inch deep into your handrail. This will 
allow you to slide the baluster up into the 
handrail and drop down into the cap.
www.houseofforgings.net









