Service Manual

Table Of Contents
15
2. Sequence Flow Chart
F/S check
1 to 3-min. timer in control
(S4 dip switch 1 & 2)
"G" Control Board Sequence Flow Chart
1. 1-Minute Fill
Cycle
Cycle Steps
2. Harvest Cycle
•WVtime:6min.orthelengthofharvestminus50sec.
(S4 dip switch 7), whichever is shorter. DO NOT
ADJUST S4 dip switch 7.
•Maximumharvesttime:20min.
Thermistor
in control
3. Freeze Cycle
•Minimumfreezetime:5min.
•Maximumfreezetime:freezetimersetting
(S4 dip switch 9 & 10)
F/S in control
4. Pump-Out Cycle
•Factorysetforevery
10th cycle
(S4 dip switch 5 & 6)
•PMstopsfor2sec.,
then reverses for
10/20 sec.
(S4 dip switch 3 & 4)
DO NOT ADJUST S4
dip switch 3 and 4 to
3 off and 4 on.
WV energized
F/S open
WV continues
Comp energized
FMR energized
HGVs energized
Thermistor temperature
reaches 48°F (9°C)
(3.9 kΩ or less).
Harvest timer starts.
F/S open
Comp continues
FMR continues
PM continues
LLVs energized
HGVs de-energized
F/S closed
Comp continues
FMR continues
PM de-energized for 2 sec., then
energized in reverse
direction for 10/20 sec.
HGVs energized
LLVs de-energized
F/S check
Startup begins
here after 5-sec.
delay
If F/S is open, Comp and FMR de-energize and cycle returns to 1-Minute Fill Cycle
5-min. timer in
control
F/S closed
F/S open or freeze
timer terminates
50 sec.
PM energized
WV de-energized
Harvest Pump
Timer
KMS-830MLH with SRK-8H/3
Legend:
BC–bin control
Comp–compressor
FMR–fan motor-remote
F/S–oat switch
HGVs–hot gas valves (KMS and SRK)
LLVs–liquid line valves (KMS and SRK)
PM–pump motor
WV–inlet water valve
1. Bin Full
Shutdown Delay:
•Fill Cycle – 15 sec. after activation.
•Harvest Cycle – At the end of the harvest cycle, or up to 15 sec. into the
freeze cycle if activated at the end of the harvest cycle.
•Freeze Cycle – 15 sec. after activation if activated at least 15 sec. before
the 5-min. short cycle protection timer terminates.
Otherwise, at the end of the next harvest cycle.
Shutdown
andRestart
BC Operation
BC open
Green"BCCLOSED"LEDoff
Yellow"BCOPEN"LEDon
Yellow"BCOPEN"LEDcontinues
All components de-energized
2. Icemaker Off
All components
de-energized.
3. Ice Level Lowered
Ice level lowered. No ice
pressing against BC actuator
paddle. Icemaker starts at
"1.1-MinuteFillCycle."
To 1 above
BC closed
Green"BCCLOSED"LEDon
Yellow"BCOPEN"LEDoff
Components Energized when the Control Switch is in the "WASH" Position
The"WASH"positiononthecontrolswitchisusedwhencleaningandsanitizingtheunit.Wheninthe"WASH"position,
power is supplied to the pump motor. With the cleaning valve closed, the cleaner and sanitizer ow over the outside of
the evaporator plate assembly. With the cleaning valve open, the cleaner and sanitizer ow over both the outside and the
inside of the evaporator plate assembly.
Note: Close the cleaning valve after cleaning and sanitizing are complete, otherwise the unit will not re-start when the
controlswitchisplacedinthe"ICE"position.