Service Manual
Table Of Contents
- Important Safety Information
- I. Construction and Water/Refrigeration Circuit Diagram
- II. Sequence of Operation and Service Diagnosis
- III. Controls and Adjustments
- A. Control Board Layout
- B. LED Lights and Audible Alarm Safeties
- C. Settings and Adjustments
- 1. Default Dip Switch Settings
- 2. Harvest Timer (S4 dip switch 1 & 2)
- 3. Pump-Out Timer (S4 dip switch 3 & 4)
- 4. Pump-Out Frequency Control (S4 dip switch 5 & 6)
- 5. Harvest Pump Timer Operation (S4 dip switch 7)
- 6. Factory Use (S4 dip switch 8)
- 7. Freeze Timer (S4 dip switch 9 & 10)
- 8. Float Switch Selector (S5 dip switch 1)
- 9. Refill Counter (S5 dip switch 2, 3, and 5), Program Selector (4)
- D. Switches
- IV. Refrigeration Circuit and Component Service Information
- V. Maintenance
- VI. Preparing the Appliance for Periods of Non-Use
- VII. Disposal
- VIII. Technical Information
27
h) Freeze Termination Diagnosis: After 5 min. in freeze, disconnect CB K5 FS
connector. 15 sec. later appliance should switch out of the freeze cycle (15 second
delay after FS opens before terminating the freeze cycle). If appliance remains in
freeze longer than 15 sec. after FS removed, replace CB. If appliance switches with
FS removed but would previously not switch out of freeze with FS connected (long
freeze - 3 beep alarm), see "II.E. Float Switch Check and Cleaning."
Note: Normal freeze cycle will last 20 to 40 min. depending on model and conditions.
Cycle times and pressures should follow performance data provided in this
manual. See "VIII.A. Specication and Performance Data Sheets."
i) Short Freeze Cycle Diagnosis: Conrm water tank lls and overows during 1 min.
ll and harvest cycles. If not, check water supply lters, shut-off valve, WV screen.
Ifwater tank empties before 5 min. timer terminates and freeze cycle is short, check
that DV is not leaking by or energized (water owing through DV). If DV is leaking by,
remove and clean DV, replace as needed. If water tank is full, see "II.E. Float Switch
Check and Cleaning." for erratic operating FS.
7) Pump-Out Cycle – LEDs 1, 3, and 2 are on (10/20 second pump-out). Timing of the
rst pump-out is determined by S4 dip switch 5& 6. See the table below.
"G" Control Board Settings 1st Pump-Out
S4 Dip Switch Setting
Pump-Out
Frequency
"G" Control Board
No. 5 No. 6
OFF OFF Every cycle After 2nd freeze cycle
ON OFF Every 2 cycles After 3rd freeze cycle
OFF ON Every 5 cycles After 6th freeze cycle
ON ON Every 10 cycles After 11th freeze cycle
Comp and FMR continue, HGV energizes, LLV and FM de-energize. NOTICE!S4dip
switch 3 & 4 must not be set to 3 off and 4 on. Otherwise, LED 4 turns on
energizing WV and X11 relay. This energizes the X10relay which prevents the
X12 relay and DV from energizing. PM stops for 2 sec., then PM and DV energize
for 10/20 sec. depending on pump-out timer (S4dip switch 3 & 4) setting. When the
pump-out timer terminates, pump-out is complete. The pump-out frequency control (S4
dip switch 5 & 6) is factory set, and generally no adjustment is required. However, the
pump-out frequency control can be set to have a pump-out occur every cycle, or every
2, 5, or 10 cycles. For details, see "III.C.4. Pump-Out Frequency Control (S4 dip switch
5 & 6)."