Service Manual
Table Of Contents
- Important Safety Information
- I. Construction and Water/Refrigeration Circuit Diagram
- II. Sequence of Operation and Service Diagnosis
- III. Controls and Adjustments
- A. Control Board Layout
- B. LED Lights and Audible Alarm Safeties
- C. Settings and Adjustments
- 1. Default Dip Switch Settings
- 2. Harvest Time (S4 dip switch 1 & 2)
- 3. Pump-Out Time/Harvest Time During Pump-Out (S4 dip switch 3 & 4)
- 4. Pump-Out Frequency Control (S4 dip switch 5)
- 5. Harvest Pump Time (Harvest Assist Duration) (S4 dip switch 6)
- 6. Harvest Pump Time (Harvest Assist) (S4 dip switch 7)
- 7. Factory Use (S4 dip switch 8)
- 8. Freeze Timer (S4 dip switch 9 & 10)
- 9. Float Switch Selector (S5 dip switch 1)
- 10. Refill Counter (S5 dip switch 2 and 3)
- 11. Minimum Harvest Time (S5 dip switch 4)
- 12. Slush Control (S5 dip switch 5)
- IV. Refrigeration Circuit and Component Service Information
- V. Maintenance
- VI. Preparing the Appliance for Periods of Non-Use
- VII. Disposal
- VIII. Technical Information
28
F. Thermistor Check
To check thermistor resistance, follow the steps below.
1) Turn off the power supply.
2) Remove the front panel, then move the control switch to the "OFF" position.
3) Remove the top and right side panels, then remove the control box cover.
4) Remove the thermistor.
5) Immerse the thermistor sensor portion in a glass containing ice and water for 2 or
3 minutes.
6) Disconnect the thermistor connector from CB K3 (white) connector and check
resistance between thermistor leads. Normal range is 4.7 to 6.2 kΩ. If outside the
normal range, replace the thermistor. See "IV.B. Component Service Information."
If within the normal range, continue to next step.
7) Replace the thermistor in its correct position. See "IV.B. Component Service
Information."
8) Reconnect the thermistor connector to CB K3 (white) connector.
9) Replace the control box cover, right side, and top panels in their correct positions.
10) Move the control switch to the "ICE" position.
11) Replace the front panel in its correct position.
12) Turn on the power supply.
13) Once the harvest cycle starts (Comp energizes), begin timing the harvest cycle.
14) The harvest timer and harvest cycle should terminate within 2 to 5 minutes. If the
harvest cycle does not terminate within 2 to 5 minutes, replace CB.
Legend: CB–control board; Comp–compressor
Foam Insulation Thermistor Holder
Thermistor Lead Cable Tie
Fig. 4