Service Manual

Table Of Contents
21
7) Pump-Out Cycle – LEDs 1, 3, and 5 are on (10/20 second pump-out). Timing of the
rst pump-out is determined by S4 dip switch 5. See the table below.
Control Board Settings
S4 Dip Switch Setting
Pump-Out Frequency Control Board
No. 5
OFF Every 10 cycles After 11th freeze cycle
ON Every cycle After 2nd freeze cycle
Comp and FMR continue, HGV energizes.
Note: If S4dip switch 3 & 4 are set to 3 off and 4 on, LED 4 turns on and WV energizes.
NOTICE!S5 dip switch 1 must not be adjusted. This is the pump-out circulation
selection and allows DV to energize in pump-out.
FM and LLV de-energize. PM stops for 2 sec., then PM and DV energize for 10/20 sec.
depending on pump-out timer (S4dip switch 3 & 4) setting. When the pump-out timer
terminates, pump-out is complete. The pump-out frequency control (S4 dip switch 5) is
factory set, and generally no adjustment is required. However, the pump-out frequency
control can be set to have a pump-out occur every 10 cycles or every cycle. For details,
see "III.C.4. Pump-Out Frequency Control (S4 dip switch 5)."
Pump-Out Diagnosis: In the freeze cycle before pump-out (see table above), after
5min. of freeze disconnect CB black K5 connector (FS connector). Check that PM
stops and re-starts. Next, check that PM and DV energized (water owing down the
drain through DV). If PM does not stop and re-start, check that CB LEDs 1, 3, and
5are on. If not, replace CB. IfLEDs1,3, and 5 are on and PM does not energize,
check for 115VAC at CB K1 #4 (R) to neutral (W). If 115VAC is not present, replace CB.
If not, check PM motor windings and impeller for binding. If energized, make sure DV
energized. If not, check for 115VAC at CB K1 #5 (W/BU). If 115VAC is not present and
LED 5 is on, replace CB. If 115VAC is present, check DV solenoid continuity. Replace as
needed. If DV is energized and open, check that the drain line is not clogged.
Conrm FM and LLV de-energize. If FM or LLV are energized with LEDs 1, 3, and 5 on,
replace CB.
8) Normal Harvest Cycle – Same as the initial harvest cycle. Return to step 5a) above.
Note: Appliance continues to cycle until BC is satised or power is switched off.
Theappliance always restarts at the 1-min. ll cycle.
2. Shutdown Diagnosis
1) See "II.E.1. Bin Control Check."
3. Freeze-Time Correction Cycle Diagnosis
1) See "II.C. Freeze-Time Correction Cycle."
Legend: BC–bin control; CB–control board; Comp–compressor; CT–control transformer;
DV–drain valve; FM–fan motor; FMR–fan motor remote; FS–oat switch; HGV–hot
gas valve; HM–headmaster (C.P.R.); HPS–high-pressure switch; LLV–liquid line
valve; PM–pump motor; TXV–thermostatic expansion valve; WRV–water regulating
Valve; WV–inlet water valve