Service Manual
Table Of Contents
- Important Safety Information
- I. Construction and Water/Refrigeration Circuit Diagram
- II. Sequence of Operation and Service Diagnosis
- III. Controls and Adjustments
- A. Control Board Layout
- B. LED Lights and Audible Alarm Safeties
- C. Settings and Adjustments
- 1. Default Dip Switch Settings
- 2. Harvest Time (S4 dip switch 1 & 2)
- 3. Pump-Out Time/Harvest Time During Pump-Out (S4 dip switch 3 & 4)
- 4. Pump-Out Frequency Control (S4 dip switch 5)
- 5. Harvest Pump Time (Harvest Assist) (S4 dip switch 6)
- 6. Harvest Pump Time (Harvest Assist)/Freeze-Time Correction (S4 dip switch 7)
- 7. Factory Use (S4 dip switch 8)
- 8. Freeze Timer (S4 dip switch 9 & 10)
- 9. Float Switch Selector (S5 dip switch 1)
- 10. Refill Counter (S5 dip switch 2 and 3)
- IV. Refrigeration Circuit and Component Service Information
- V. Maintenance
- VI. Preparing the Icemaker for Periods of Non-Use
- VII. Disposal
- VIII. Technical Information
- A. Specification and Performance Data
- 1. KM-1301SAJ
- 2. KM-1301SAJ3
- 3. KM-1301SWJ
- 4. KM-1301SWJ3
- 5. KM-1301SRJ with URC-14F
- 6. KM-1301SRJ3 with URC-14F
- 7. KM-1601SAJ
- 8. KM-1601SAJ3
- 9. KM-1601SWJ
- 10. KM-1601SWJ3
- 11. KM-1601SRJ with URC-22F
- 12. KM-1601SRJ3 with URC-22F
- 13. KM-1900SAJ
- 14. KM-1900SAJ3
- 15. KM-1900SWJ
- 16. KM-1900SWJ3
- 17. KM-1900SRJ with URC-22F
- 18. KM-1900SRJ3 with URC-22F
- 19. KM-2200SWJ3
- 20. KM-2200SRJ3 with URC-22F
- 21. KM-2600SWJ3
- 22. KM-2600SRJ3 with URC-23F
- B. Wiring Diagrams
- A. Specification and Performance Data
17
Shutdown Flow Chart
1. Bin Full
Shutdown Delay:
• Fill Cycle–15 sec. after activation.
• Harvest Cycle–At the end of the harvest cycle, or up
to 15 sec. into the freeze cycle if
activated at the end of the harvest cycle.
• Freeze Cycle– 15 sec. after activation if activated at least
15 sec. before the 5-min. short cycle
protection timer terminates.
Otherwise, at the end of the next harvest
cycle.
Shutdown
and Restart
BC Operation
BC open (BC actuator paddle engaged)
Green "BC CLOSED" LED off
Yellow "BC OPEN" LED on
Yellow "BC OPEN" LED continues.
All components de-energized.
2. Icemaker Off
All components
de-energized.
3. Ice Level Lowered
Icemaker starts at
"1. 1-Minute Fill Cycle."
BC closed
(BC actuator paddle disengaged)
Green "BC CLOSED" LED on
Yellow "BC OPEN" LED off
To 1. 1-Minute Fill Cycle
Legend:
BC–bin control
2. Shutdown Flow Chart
Control board 2A7664-02 retains freeze-time
correction count data between bin control restarts.