Service Manual

35
[d] Upper Evaporator
1) Remove the front panel (lower) and rear panel, move the control switch to the “OFF”
position, and then unplug the appliance.
2) Close the water supply line shut-o󰀨 valve.
3) Remove the top panel, top insulation, and top cover.
4) Remove the front frame, drain pan, ice guide, water tank assembly, inlet water valve,
water supply pipe, actuator motor assembly, and cam shaft assembly.
5) Loosen the ange nut xed to the evaporator bracket, and lower the evaporator to keep
a distance from the mechanism base.
6) Remove the access valve from the condenser shroud, and recover the refrigerant from
the access valve.
7) Remove the upper evaporator copper tubes using brazing equipment.
8) Remove the ange nuts xed to the evaporator bracket to release the evaporator from
the bottom side.
9) Remove the collars, evaporator bolts, and ange nuts from the upper evaporator.
10) Replace the upper evaporator, and braze the copper tubes.
11) Replace the removed parts in the reverse order of the removal procedure.
12) Open the water supply line shut-o󰀨 valve.
3Dprt
B C
D E
F GA
6
5
3
4
2
1
A B C D E F G H
1
2
3
4
5
6
201802
3J
50 0 50
DRAWINGNo.
(30)
TITLE
(20)
メイショウ
図番
(  )
DRAWN
DESIGNED
CHECKED
APPROVED
DATE SCALE
UNIT
mm
ホシザキ株式会社
HOSHIZAKICORPORATION
山崎
アイスキューバAY
野津
石富
1H6250
A
2020.01.09
石富 1:10
1
No. PARTSCODE NAME&SPEC. Q'TY Z
0
1H6250A01
アイスキューバAY
0
寸法区分
普通寸法公差(±)単位mm角度差(±)
指示なき取
付穴のピッ
チとその累
積公差は
O O
4以下 0.05 0.1 0.2 0.3 0.5 1 3 6
4をこえ16〃 0.1 0.2 0.3 0.5 0.7 1 2 3
16〃63〃 0.2 0.3 0.5 0.7 1.2 20' 1 2
63〃250〃 0.3 0.5 0.7 1.2 2.0 10' 20' 1
250〃1000〃 0.5 0.7 1.2 2.0 3.0 5' 10' 30'
1000をこえる 0.7 1.2 2.0 3.0 5.0 5' 10' 30'
J K L M N JK LM N
1
1
2020.02.21
品番63追加
石富 山崎
SYMBOL P DATE REVISION DESIGNED APPROVED
不動態化処理
焼痕除去
脱脂洗浄
焼痕銀粉塗布
バリ無きこと
C-C
1:5
Hot Gas Valve Coil
Hot Gas Valve Body
Drier
Shroud
Shroud Fixing Screw
Condenser Fixing Screw
Condenser
Hook
Air Guide
Control Box
Control Switch