Service Manual
Table Of Contents
- Important Safety Information
- I. Construction and Water/Refrigeration Circuit Diagram
- II. Sequence of Operation and Service Diagnosis
- III. Controls and Adjustments
- A. Control Board
- B. Controls and Adjustments
- 1. Default Dip Switch Settings
- 2. BC (Infrared Sensor) Shutdown Delay (S1 dip switch 1, 2, 3)
- 3. Drain Frequency Control (S1 dip switch 4)
- 4. Continuous Dispensing Timer (S1 dip switch 5 & 6)
- 5. Bin Control Selector (S1 dip switch 7)
- 6. BC (Mech. Stand-Alone or Backup (only)) Shutdown Delay (S1 dip switch 8)
- 7. Shutdown Sequence (S1 Dip Switch 9)
- 8. Factory Use (S1 Dip Switch 10)
- IV. Refrigeration Circuit and Component Service Information
- V. Maintenance
- VI. Disposal
- VII. Technical Information
12
II. Sequence of Operation and Service Diagnosis
A. Sequence of Operation Flow Chart
1. Operation Flow Chart
1-in-1 drain cycle. DV opens for 2 sec.
every hour (CB S1 Dip Switch 4).
Icemaker status does not change.
Operation Flow Chart
LFS closed
UFS closed
FZT starts
FT terminated
WV de-energized
3. 1-in-12 Drain Cycle
& Restart (optional)
UFS open
LFS open (WV on)
FT starts (90 sec.)
FZT terminated
WV energized
Comp continues
EH continues
FMR continues
GM continues
PDS continues
1. Startup
2. Ice Purge Cycle
WV energized
Power Switch "ON"
Control Switch in "ICE"
POWER OK LED on
BC Green LED on
BC Yellow LED off
2. 1-in-1 Drain Cycle
Comp de-energized
FMR de-energized
PDS de-energized
GM continues
1. Fill Cycle
3. Freeze Cycle
LFS closed
UFS closed
FZT starts (30 min.)
FT terminated
WV de-energized
Comp continues
EH continues
FMR continues
GM continues
PDS continues
Low Water Safety
Purge Timer
UFS open
WV energized
PDS de-energized
(CLPS opens)
Comp de-energized
FMR de-energized
GM continues
DV energized
GM de-energized
10-min. DT terminated
DV de-energized
1-in-12 DT reset
5 min.
4. Icemaker Restart
2. Ice Purge Cycle
3. 10-Min. Drain
If Fill > 90 sec. FT
1-beep alarm sounds
WV continues
When UFS closes
alarm resets and
2. Ice Purge Cycle starts.
FT Maximum
90 sec.
4. 1-in-12 Drain Cycle - Although the factory default 1-in-1 drain cycle
is recommended, a 1-in-12 drain cycle is available. For 1-in-12 drain cycle
sequence, see "3. 1-in-12 Hour Drain Cycle & Restart (optional)."
Re๎ll
FT Maximum
90 sec.
90 sec. FT exceeded, 90
sec. PT starts and 1-beep
alarm sounds
90. sec. PT terminates
unit shuts down and
1-beep alarm continues.
When UFS closes, alarm
resets and 2. Ice Purge
Cycle starts.
WV continues
GM de-energized
1. DT Initiates DC
To bypass, press the
"SERVICE" button after
GM starts.
5 min.
to "1. Fill Cycle" above
90 sec.
(CB S1 dip switch 4 "ON")
FT off (90 sec.)
5 or 30 sec.
(S1 Dip Switch 7)
EH energized
GM energized
1. DT Initiates DC
Continued uninterrupted
operation
DV energizes for 2 sec.
2. Continued Operation
DV de-energizes, no interruption
in ice production
30-min. FZT
Startup
FZT exceeded (LFS does not
open): CB shuts down icemaker
and sounds a 5-beep alarm.
Legend:
BC-bin control (infrared sensor)
CB-control board
CCH-crankcase heater
CLPS-control low-pressure switch
Comp-compressor
DC-drain cycle
DT-drain timer
DV-drain valve
EH-evaporator heater
FMR-fan motor-remote
FT-๎ll timer (low water safety)
FZT-freeze timer
GM-gear motor
LFS-lower ๎oat switch
PDS-pump-down solenoid valve
PT-purge timer
UFS-upper ๎oat switch
WV-inlet water valve
Low Water Safety
Shutdown
(CB S1 dip switch 4 "OFF")
Normal Operation
PDS energized
CLPS closed
Comp energized
FMR energized
EH continues
GM continues
Note: CCH energizes when power is supplied to SRC.
CCH de-energizes when Comp is energized.
See "VII.B.3. SRC-10J Condensing Unit."