Instruction Manual

30
6) Evacuate the line set copper tubes through the charging ports on the Parker quick
connect couplings and charge with R-404A refrigerant vapor to a pressure of 15 to
30 PSIG.
7) Connect the refrigerant lines to the appropriate ttings on the rack system rst (if not
already brazed on), then at the icemaker.
If the couplings to the rack system are not Parker quick connect couplings, follow the
coupling manufacturer's instructions. Make a proper Parker quick connect coupling
connection as follows:
a. Remove the protective covers from the male tting and female coupling.
b. Apply Polyol Ester (POE) refrigerant oil or Parker Super O Lube to the entire male
tting, including O-ring, diaphragm, and threads, before making the connection.
SeeFig. 16. NOTICE! Do not use thread sealant on the ttings. Use POE
refrigerant oil or Parker SuperOLube only. Couplings are one-time use only.
c. Make sure the male tting and female coupling are properly aligned, then start the
connection by hand to ensure that it is not cross threaded.
d. Place a backup wrench on the back of the female coupling, then tighten the
connection with a wrench until it is tight. At this point, the nut has covered most of
the threads on the male tting. NOTICE! Failure to use a backup wrench may
result in damage to the line set and possible refrigerant leaks.
e. Mark a reference line on the female coupling and the unit panel. Using a backup
wrench on the back of the female coupling, tighten the six-sided nut of the female
coupling an additional 1/6 turn. See Fig. 17. NOTICE! Conrm connection is free
of leaks.
8) Open the rack system service valves.