Instructions Manual

24
9) Allow the icemaker to sit for 10 min. before operation. If you placed a clamp on the
reservoir hose in step 7, remove it before operation.
10) In bad or severe water conditions, clean the oat switch assembly as described below.
See Fig. 9. Otherwise, continue to step 11.
a. Remove the oat switch assembly from
the reservoir cover.
b. Wipe down the oat switch assembly
with the cleaning solution.
c. Rinse the oat switch assembly
thoroughly with clean water.
d. Replace the oat switch assembly in its
correct position.
11) Move the control switch to the "ICE" position, then move the power switch to the "ON"
position. Replace the front and top panels in their correct positions. Make ice using the
solution until the icemaker stops making ice.
12) Remove the top and front panels.
13) Move the power switch to the "OFF" position, then move the control switch to the
"DRAIN" position. Next, move the power switch to the "ON" position. Replace the front
and top panels in their correct positions. Allow the water system to drain for 5min.
14) After the water system has drained, remove the top and front panels, then move the
power switch to the "OFF" position.
15) Move the control switch to the "ICE" position.
16) Move the power switch to the "ON" position, then replace the front and top panels in
their correct positions.
17) Open the water supply line shut-off valve to supply water to the reservoir.
18) After the gear motor starts, remove the top and front panels.
19) Move the power switch to the "OFF" position, then move the control switch to the
"DRAIN" position. Next, move the power switch to the "ON" position. Replace the front
and top panels in their correct positions. Allow the water system to drain for 5min.
20) After the water system has drained, remove the top and front panels, then move the
power switch to the "OFF" position.
Note: If you do not sanitize the unit, go to step 16 in "III.B.5. Sanitizing
Procedure - Final."
21) Close the icemaker water supply line shut-off valve.
Float Switch Assembly
Reservoir
Reservoir Cover
Fig. 9