Service Manual
Table Of Contents
- Important Safety Information
- I. Construction and Water/Refrigeration Circuit Diagram
- A. Construction
- B. Icemaking Unit
- C. Water/Refrigeration Circuit Diagram
- II. Sequence of Operation and Service Diagnosis
- A. Sequence of Operation Flow Chart
- 1. Icemaking and Drain Cycle
- 2. Shutdown
- B. Service Diagnosis
- 1. Ice Production Check
- 2. Diagnostic Procedure
- C. Control Board Check
- D. Bin Control Check
- E. Float Switch Check and Cleaning
- F. Diagnostic Tables
- III. Controls and Adjustments
- A. Control Board
- 1. Control Board Layout Shown:
- 2. LED Lights and Audible Alarm Safeties
- 3. Ice Purge Cycle Bypass
- B. Controls and Adjustments
- 1. Default Dip Switch Settings
- 2. Infrared Sensor Shutdown Delay (S1 dip switch 1, 2, 3)
- 3. Drain Frequency Control (S1 dip switch 4)
- 4. Continuous Dispensing Timer (S1 dip switch 5 & 6)
- 5. Bin Control Selector (S1 dip switch 7)
- 6a. Mechanical Shutdown Delay (S1 dip switch 8) Auxiliary Code E-0:
- 6b. Agitation and Ice Purge Timer (S1 dip switch 8) Auxiliary Code F-0 and Later:
- 7. Mechanical Shutdown Delay (S1 dip switch 9) Auxiliary Code F-0 and Later
- 8a. Factory Use (S1 Dip Switch 9 & 10) Auxiliary Code E-0
- 8b. Factory Use (S1 Dip Switch 10) Auxiliary Code F-0 and Later
- C. Power Switch and Control Switch
- IV. Refrigeration Circuit and Component Service Information
- A. Refrigeration Circuit Service Information
- B. Component Service Information
- V. Maintenance
- VI. Disposal
- VII. Technical Information
- A. Specification & Performance Data Sheets
- 1. F-330BAJ
- 2. F-330BAJ-C
- B. Wiring Diagram
46
15) Replace the top and side panels in their correct positions.
16) Move the control switch to the "ICE" position.
17) Move the power switch to the "ON" position, then turn on the power supply.
18) Replace the front panel in its correct position.
7. Removal and Replacement of Gear Motor
1) Drain the water from the evaporator.
a) Remove the front panel, then move the power switch to the "OFF" position.
b) Move the control switch to the "DRAIN" position.
c) Move the power switch to the "ON" position and allow the water to drain from the
evaporator.
d) Move the power switch to the "OFF" position, then turn off the power supply.
2) Remove the top and side panels.
3) Remove the strap connecting the spout to the chute assembly, then remove the spout.
4) Remove the hex head bolts and washers securing the lower housing to the gear motor.
Lift the evaporator up slightly.
5) Remove the socket head cap screws and split lock washers securing the gear motor.
6) Disconnect the gear motor wiring, then remove the gear motor.
7) Remove the gear motor bracket and spline coupling from the old gear motor and place
on the new gear motor.
8) Install the new gear motor and re-connect the electrical wires.
9) Replace the removed parts in the reverse order of which they were removed.
10) Replace the top and side panels in their correct positions.
11) Move the control switch to the "ICE" position.
12) Move the power switch to the "ON" position, then turn on the power supply.
13) Replace the front panel in its correct position.