Service Manual
Table Of Contents
- Important Safety Information
- I. Construction and Water/Refrigeration Circuit Diagram
- A. Construction
- B. Icemaking Unit
- C. Water/Refrigeration Circuit Diagram
- II. Sequence of Operation and Service Diagnosis
- A. Sequence of Operation Flow Chart
- 1. Icemaking and Drain Cycle
- 2. Shutdown
- B. Service Diagnosis
- 1. Ice Production Check
- 2. Diagnostic Procedure
- C. Control Board Check
- D. Bin Control Check
- E. Float Switch Check and Cleaning
- F. Diagnostic Tables
- III. Controls and Adjustments
- A. Control Board
- 1. Control Board Layout Shown:
- 2. LED Lights and Audible Alarm Safeties
- 3. Ice Purge Cycle Bypass
- B. Controls and Adjustments
- 1. Default Dip Switch Settings
- 2. Infrared Sensor Shutdown Delay (S1 dip switch 1, 2, 3)
- 3. Drain Frequency Control (S1 dip switch 4)
- 4. Continuous Dispensing Timer (S1 dip switch 5 & 6)
- 5. Bin Control Selector (S1 dip switch 7)
- 6a. Mechanical Shutdown Delay (S1 dip switch 8) Auxiliary Code E-0:
- 6b. Agitation and Ice Purge Timer (S1 dip switch 8) Auxiliary Code F-0 and Later:
- 7. Mechanical Shutdown Delay (S1 dip switch 9) Auxiliary Code F-0 and Later
- 8a. Factory Use (S1 Dip Switch 9 & 10) Auxiliary Code E-0
- 8b. Factory Use (S1 Dip Switch 10) Auxiliary Code F-0 and Later
- C. Power Switch and Control Switch
- IV. Refrigeration Circuit and Component Service Information
- A. Refrigeration Circuit Service Information
- B. Component Service Information
- V. Maintenance
- VI. Disposal
- VII. Technical Information
- A. Specification & Performance Data Sheets
- 1. F-330BAJ
- 2. F-330BAJ-C
- B. Wiring Diagram
30
2. LED Lights and Audible Alarm Safeties
The "POWER OK" LED indicates proper control voltage and will remain on unless a
control voltage problem occurs. For further details, see "II.A. Sequence of Operation Flow
Chart."
Sequence Step LED
Energized
Components Min. Max.
Fill Cycle WTRIN WV - -
Ice Purge Cycle GM GM, EH, FM/FMR 5 min. 5 min.
Freeze Cycle (with rell) GM, WTRIN* (rell),
COMP
GM, EH, Comp,
FM/FMR, LLV, SLV,
WV* (rell)
- *On until UFS closes.
Alarm sounds after
90 sec.
1-in-1 hr or
1-in-12 hr
Drain Cycle
FLUSH (Drain) 1-in-1: DV-Icemaker
status does not change
1-in-12: DV
2 sec.
(1-in-1)
10 min.
(1-in-12)
The built-in alarm safeties shut down the unit.
No. of Beeps
(every 5 sec.)
Type of Alarm Reset Options
1 Low-Water Safety
UFS open > 90 sec. after WV energized.
Automatic reset once water supply is restored
and UFS closes.
2 Control Switch
In "DRAIN" position longer than 15 min.
Automatic reset once the control switch is
moved to the "ICE" position.
3 High-Pressure Switch
First and sec. activation in 1 hour.
Automatic reset once pressure drops below the
high pressure threshold and the high pressure
switch closes.
4 High-Pressure Switch
Third activation in 1 hour.
Call for service. To avoid possible catastrophic
failure, it is recommended to leave the
icemaker off until this alarm is resolved.
Manual reset. Turn power off and on again.
5 Freeze Timer
WV off > 30 min. since last WV activation.
Manual reset. Turn power off and on again.
6 Low Voltage
(92VAC±5% or less)
"POWER OK" LED turns off if voltage
protection operates.
The control voltage safeties automatically reset
when voltage is corrected.
7 High Voltage
(147VAC±5% or more)
8 Gear Motor
CCR contacts fail to close.
Manual reset. Turn power off and on again.
9 Open Circuit CB K8 #3 and #4.
(CB S1 dip switch 7 on)
Backup MBC engaged or jumper open.
Manual reset. Turn power off and on again.
Legend: BC–bin control; CB–control board; CCR–compressor control relay;
Comp–compressor; DV–drain valve; EH–evaporator heater; FM–fan motor;
FMR–fan motor-remote; GM–gear motor; L LV–liquid line valve (MLH model
only); MBC–mechanical backup bin control; SLV –suction line valve (MLH model
only); UFS–upper oat switch; WV–inlet water valve