Instruction Manual
Table Of Contents
- Important Safety Information
- I. Specifications
- A. Electrical and Refrigerant Data
- B. Dimensions/Connections
- II. Installation and Operating Instructions
- A. Location
- B. Checks Before Installation
- C. How to Remove Panels
- D. Setup
- E. Electrical Connection
- F. Water Supply and Drain Connections
- G. Final Checklist
- H. Startup
- I. Bin Control Check
- J. Alarm Safeties
- III. Maintenance
- A. Maintenance Schedule
- B. Cleaning and Sanitizing Instructions
- 1. Cleaning Solution
- 2. Cleaning Procedure
- 3. Sanitizing Solution
- 4. Sanitizing Procedure - Initial
- 5. Sanitizing Procedure - Final
- IV. Preparing the Appliance for Periods of Non-Use
- V. Disposal
22
IV. Preparing the Appliance for Periods of Non-Use
NOTICE
When storing the appliance for an extended time or in sub-freezing temperatures,
follow the instructions below to prevent damage.
When the appliance is not used for two or three days under normal conditions, it
is sufficient to only move the power switch to the "OFF" position. When storing the
appliance for extended time or in sub-freezing temperatures, follow the instructions below.
1) Run the appliance with the water supply line shut-off valve closed. Allow the appliance to
make ice until it stops automatically.
2) Open the water supply line drain valve and blow the line out using compressed air or
carbon dioxide.
3) Remove the front panel. Move the power switch to the "OFF" position, then move the
control switch to the "DRAIN" position. Move the power switch to the "ON" position to
drain the remaining water from the appliance.
4) After the water has drained, move the power switch to the "OFF" position. Unplug the
appliance.
5) Replace the front panel.
6) Close the water supply line drain valve.
7) Remove all ice from the ice storage bin, then clean and rinse the bin.