Instruction Manual
Table Of Contents
- Important Safety Information
- I. Specifications
- A. Electrical and Refrigerant Data
- B. Dimensions/Connections
- II. Installation and Operating Instructions
- A. Location
- B. Checks Before Installation
- C. How to Remove Panels
- D. Setup
- E. Electrical Connection
- F. Water Supply and Drain Connections
- G. Final Checklist
- H. Startup
- I. Bin Control Check
- J. Alarm Safeties
- III. Maintenance
- A. Maintenance Schedule
- B. Cleaning and Sanitizing Instructions
- 1. Cleaning Solution
- 2. Cleaning Procedure
- 3. Sanitizing Solution
- 4. Sanitizing Procedure - Initial
- 5. Sanitizing Procedure - Final
- IV. Preparing the Appliance for Periods of Non-Use
- V. Disposal
20
18) Open the water supply line shut-off valve to supply water to the reservoir.
19) After the gear motor starts, remove the front panel. Move the power switch to the "OFF"
position, then move the control switch to the "DRAIN" position. Move the power switch
to the "ON" position to drain the appliance.
20) After the water has drained, move the power switch to the "OFF" position. Unplug the
appliance.
Note: If you do not sanitize the appliance, leave the appliance plugged in with the power
switch in the "ON" position and go to step 17 in "5. Sanitizing Procedure - Final."
3. Sanitizing Solution
Dilute 2.5 ๎. oz. (74 ml or 5 tbs) of a 5.25% sodium hypochlorite solution (chlorine bleach)
with 5 gallons (19 l) of warm water. This is a minimum amount. Make more solution if
necessary. IMPORTANT! For safety and maximum effectiveness, use the solution
immediately after dilution.
4. Sanitizing Procedure - Initial
1) Close the water supply line shut-off valve.
2) Remove the top panel. Remove the bin control assembly from the top insulation and set
it aside. Remove the top insulation.
3) Remove spout B, then remove spout A. Remove spout packing A and the cylinder
packing. See Fig. 5.
4) Pour the sanitizing solution over the extruding head until
the evaporator assembly and the reservoir are full and
the solution starts to run through the over๎ow hose on the
reservoir.
5) Lift up slightly on the clip securing the bin control switch to
the paddle assembly and slide the switch out. See Fig. 6.
6) Soak the spouts, packings and paddle assembly in the
sanitizing solution for 10 minutes then wipe them down.
7) Rinse the parts thoroughly, then replace all parts and the top
panel.
8) Plug the appliance back in. Move the control switch to the "ICE" position, then move the
power switch to the "ON" position. Replace the front panel and allow the appliance to
make ice using the solution until it stops automatically.
5. Sanitizing Procedure - Final
1) Remove the front panel.
2) Move the power switch to the "OFF" position, then move the control switch to the
"DRAIN" position. Move the power switch to the "ON" position to drain the remainder of
the solution.
3) After the solution has drained, move the power switch to the "OFF" position. Unplug the
appliance.
4) Remove the top panel.
Clip
Bin Control
Switch
Paddle
Assembly
Fig. 6