Service Manual

Table Of Contents
12
II. Sequence of Operation and Service Diagnosis
A. Sequence of Operation Flow Chart
Sequence Flow Chart
Control Boards: 2A4296-01, 2A8054-01 and 2A9093-01
DCM-300BAH(-OS) F-1 and Later
DCM-500B_H(-OS) H-0 and Later
DCM-75_B_H(-OS) A-0 and Later
1-in-1 drain cycle. DV energizes for 2 seconds every hour
(S1 Dip Switch 4).
Does not affect operation.
GM energized
UFS open
LFS open
FT starts (90 sec.)
WV energized
Comp energized
FM energized
GM energized
1. Startup
2. Ice Purge Cycle
Comp energized
FM energized
GM energized
Power Switch "ON"
Control Switch in "ICE"
CB "POWER OK" LED on
1. Fill Cycle
3. Freeze Cycle
LFS closed
UFS closed
FT terminates
WV de-energized
Comp energized
FM energized
GM energized
Low Water Safety
1-beep alarm sounds
PT starts
UFS open
Comp de-energized
FM de-energized
WV energized
GM energized
Legend:
BC-bin control
CB-control board
Comp-compressor
DC-drain cycle
DT-drain timer
DV-drain valve
FM-fan motor
FT-๎˜Ÿll timer (low water safety)
GM-gear motor
LFS-lower ๎˜žoat switch
PT-purge timer
UFS-upper ๎˜žoat switch
WV-inlet water valve
4. 1-in-12 Drain Cycle - The factory default is 1-in-1 drain cycle.
IMPORTANT! Do not adjust for 1-in-12 drain cycle sequence on
this model.
Re๎˜Ÿll
Maximum
90 seconds
90 sec. FT exceeded
1-beep alarm sounds
90 sec. PT starts
When UFS closes,
alarm resets and
2. Ice Purge Cycle
starts.
1-beep alarm continues
WV energized
GM de-energized
90 seconds
FT
exceeded
PT
terminates
To bypass, press the
"SERVICE" button after
GM starts.
5-min.
5 sec.
Maximum
90 seconds
LFS closed
UFS closed
FT terminates
WV de-energized
WV energized
FT starts (90 sec.)
If Fill > 90 sec. FT
1-beep alarm sounds
WV energized
When UFS closes
alarm resets and
2. Ice Purge Cycle starts.
to "2. Ice Purge Cycle" above if UFS
closed. To "1. Fill Cycle" above if UFS
open.
1. Bin Full
GM energized
Comp de-energized
FM de-energized
GM de-energized
3. Icemaker Off
BC open
Comp energized
FM energized
GM energized
2. Ice Purge Cycle
4. Icemaker
Restart
150-sec. Shutdown Sequence
BC closed
BC open
(BC actuator
paddle engaged)
2. Icemaker Off
2. Bin Control
Shutdown & Restart
1. Bin Full
3. Icemaker Restart
All Components de-energized
Ice level lowered
6 to 10 sec.
BC closed
(BC actuator paddle disengaged)
A. 2A4296-01: 6 to 10 sec. Shutdown
DCM-751B_H(-OS) only
E-0 and Earlier
Dip Switch 8 "ON"
Dip Switch 9 "ON" or "OFF"
B. 2A8054-01 and
2A9093-01: 90/60 sec. Shutdown
Dip Switch 8 "ON" and
Dip Switch 9 "ON"
DCM-751B_H(-OS)
F-0 and later
DCM-300/500B_H(-OS) all
to "2. Ice Purge Cycle" above if UFS closed.
to "1. Fill Cycle" above if UFS open.
BC open
(BC actuator paddle
engaged)
90 sec. 60 sec.