Service Manual
Table Of Contents
- Important Safety Information
- I. Construction and Water Refrigeration Circuit Diagrams
- II. Sequence of Operation and Service Diagnosis
- III. Controls and Adjustments
- A. Control Board Layout
- B. LED Lights and Audible Alarm Safeties
- C. Settings and Adjustments
- 1. Default Dip Switch Settings
- 2. Bin Control Shutdown Delay (Infrared Sensor) (S1 dip switch 1, 2, 3)
- 3. Drain Frequency Control (S1 dip switch 4)
- 4. Continuous Dispensing Timer (S1 dip switch 5 & 6)
- 5. Bin Control Selector (S1 dip switch 7)
- 7. Bin Control Shutdown Delay (S1 dip switch 9) (F-C CB Only)
- 8. Factory Use (S1 Dip Switch 10)
- D. Switches
- IV. Refrigeration Circuit and Component Service Information
- V. Maintenance
- VI. Preparing the Appliance for Periods of Non-Use
- VII. Disposal
- VIII. Technical Information
43
C. Icemaking Unit
1. Upper Bearing Wear Check
To ensure that the bearing inside the extruding head does not exceed the wear tolerance
of .02", follow the instructions below. See Fig. 3.
1) Move the control switch to the "OFF" position, then turn off the power supply. Remove
the front and top panels, then move the power switch to the "OFF" position.
2) Remove the top of the storage bin, then remove the agitator
by turning it counter clockwise. Next, lift the drip pan out of
the storage bin area.
3) Grasp the top of the auger and move the
auger towards you, then try to insert a
.02" round stock or pin gauge in between
the back side of the auger shaft and the
bearing surface. Check several locations
around the auger shaft. If the gauge goes
between the shaft and the bearing at
any point or if the bearing is scratched
or cracked, both the top bearing in the
extruding head and the lower bearing in the
housing should be replaced. Instructions for
removing the extruding head and housing
are located later in this procedure.
Note: Replacing the bearing requires a
bearing press adaptor. If one is not
available, replace the whole extruding
head and housing.
4) Replace the drip pan, agitator, and top of the storage bin in their correct positions.
5) Move the power switch to the "ON" position, then replace the panels in their correct
positions.
6) Turn on the power supply, then move the control switch to the "ICE" position to start the
automatic icemaking process.
.02" Round Stock
or Pin Gauge
Extruding
Head
Auger
Fig. 3
Drip Ring
Agitator