
Measure and Mark the installation position
1.Place shower tray into installation position and use spirit level to measure till leveled.
2.Draw lines at a distance of 6mm /needed distance from outer edge of shower tray.
(fixed glass outer edge position)
6 m
m
Fixed glass outer edge position