Manual

Theassembledcleanerwilllooklikethis
drawing.
Assemble handle
m
Attach upper handle
Remove clean solution tank (upper tank)
from deep Gleaner.
A1
A2
I
Attach hose holder
Position hose holder (B) onto handle by
matching tabs on rack with openings on
back of handle. Make sure holes for
bolts are aligned.
Place nuts in recessed areas on back of
handle. Hold each nut in place while
tightening each bolt securely (from the
front orthe handle) with a Phillips screw
driver.
Only two nuts are needed on this model.
The extra nut is not required but has
been provided for your convenience.
With hose hook (A1) and cord hook (A2) to
back of deep Gleaner, push upper handle
down onto lower handle. Push bolts into
holes on front of handle. If bolts will not
go through h01e easily handle is not
pushed completely down.
When handle sections are completely
together, squeeze trigger (C) and
depress Clean Surge TM Button (D) on
upper handle.
You will hear a "snap"when the trig-
ger rod is in place.
Replace clean solution tank (upper tank)
by positioning bottom first. Press on
tank handle to snap top of tank into
place.
4
Attach tool holder
Remove tool and taped screw from
holder.
Insert projections on holder into slots on
back of Gleaner.
Slide rack down into place. Insert screw
at (E) and tighten with a Phillips screw-
driver.