Prestige and VisionPRO EIM Spec Sheet 2013
Table Of Contents
- Application
- Features
- Contents
- Specifications
- System Installation
- Installation Options
- Guidelines for Installing RedLINK Devices
- Installing Equipment Interface Module (if used)
- Wiring 24 Vac Common
- Selecting Discharge and Return Air Temperature Sensor Mounting Locations
- Selecting Return Air Temperature Sensor Mounting Location
- Installing Discharge and Return Air Temperature Sensors
- Selecting Thermostat Location
- Installing Wallplate
- Power Optional REDLINK™ Accessories
- Performing Initial Setup
- Linking Thermostat to Equipment Interface Module (if used)
- Linking RedLINK™ Accessories
- Completing Initial Setup
- Adding RedLINK Accessories to the Thermostat
- Locating the Connect Buttons on RedLINK Accessories
- Finding Your Password (Date Code) to Access Installer Options
- Installer Options
- Making Changes to Installer Setup
- Installer Tests
- Operation
- Setting the time/date
- Setting the fan
- Setting system mode
- Preset Energy-Saving Schedules
- Adjusting program schedules
- Overriding schedules: residential use
- Overriding schedules: commercial use
- Viewing equipment status
- Setting vacation hold: residential use
- Setting holiday/event schedules: commercial use
- Setting custom events: commercial use
- Setting holiday schedule: commercial use
- Setting holiday override: commercial use
- Initiating occupancy mode: commercial use
- Remote setback: commercial use
- Adjusting humidification settings
- Adjusting dehumidification settings: residential use
- Adjusting dehumidification settings: commercial use
- Adjusting ventilation settings
- Customizing screen color
- Setting preferences
- Cleaning the thermostat screen
- Adjusting security settings
- Viewing dealer information
- Advanced Features
- Installer options
- Using the temperature display
- Using the humidity display
- Universal Outputs (U1, U2, U3)
- Universal Inputs (S1, S2, S3, S4)
- Alerts and Diagnostics
- Heat Pump and Backup Heat Operation
- Indoor Air Quality (IAQ) Control
- IAQ Reminders
- Customizable Reminders
- USB Port
- Commercial Features
- Overriding schedules: commercial use
- Setting holiday/event schedules: commercial use
- Setting custom events: commercial use
- Setting holiday schedule: commercial use
- Setting holiday override: commercial use
- Initiating occupancy mode: commercial use
- Ramp Rates
- Custom Names
- Remote Setback
- Economizer and Time of Day (TOD) Operation
- Pre-Occupancy Purge
- Battery Replacement
- Optional Accessories
- Portable Comfort Control
- Remote Indoor Sensors
- Backup Control
- Replacing a Thermostat
- Replacing an Equipment Interface Module
- Wiring
- EIM Wiring Diagrams
- THX9321 Thermostat Wiring Diagrams
- THX9321 Thermostat Wiring Diagrams Using Universal Relays to Control Heating or Cooling
- Wiring IAQ Equipment or a Heat/Cool Stage to the Universal Terminals
- Economizer Module Wiring Diagrams
- Wiring C7089U1006 Outdoor Sensor
- Wiring guide — Wired Indoor Sensors
- Zoning
- Troubleshooting
- Regulatory Information
THX9321 PRESTIGE
®
2.0 AND THX9421 PRESTIGE
®
IAQ WITH EIM
99 68-0311—02
2. Default is Comfort. Adjust differentials as needed.
Fig. 195.
Backup Heat Upstage Timer
The Backup Heat Upstage Timer is available for any system
with 2 heating types and the Backup Heat Differential is set to
2 °F (1.0 °C) or higher.
Backup heat is not used unless the indoor temperature drops
to the Backup Heat Differential setting or the Backup Heat
Upstage Timer expires, whichever occurs first. The upstage
timer starts when the highest stage of the previous equipment
type turns on.
Backup Heat Upstage Timer options are Off, 30 minutes to 16
hours. Default is Off.
Fig. 196.
Multistage Control
Multistage Control keeps the high stage of the equipment
running until the desired setpoint is reached. This setting is
recommended for Geothermal Heat Pumps to allow the loop to
rest.
Select Yes to turn on this feature. Default is No.
Fig. 197.
Fig. 198.