VisionPRO 8000 Spec Sheet 2017
Table Of Contents
- Application
- Features
- Contents
- Specifications
- System Installation
- Installation Options
- Guidelines for Installing RedLINK Devices
- Installing Equipment Interface Module (if used)
- Wiring 24 Vac Common
- Selecting Discharge and Return Air Temperature Sensor Mounting Locations
- Installing Discharge and Return Air Temperature Sensors
- Selecting Thermostat Location
- Installing Wallplate
- Installing VisionPRO® 8000 with RedLINK™
- Wiring the Thermostat
- Remove Coin Cell Battery Tab
- Mounting Thermostat on Wallplate
- Power Optional RedLINK™ Accessories
- Performing Initial Setup
- Installer Tests
- Operation
- Setting the Time/Date
- Setting the Fan
- Setting System Mode
- Adjusting Program Schedules
- Overriding Schedules: Residential Use
- Overriding Schedules: Commercial Use
- Viewing Equipment Status
- Setting Vacation Hold: Residential Use
- Setting Holiday/Event Schedules: Commercial Use
- Setting Custom Events: Commercial Use
- Setting Holiday Schedule: Commercial Use
- Setting Holiday Override: Commercial Use
- Initiating Occupancy Mode: Commercial Use
- Remote Setback: Commercial Use
- Adjusting Humidification Settings
- Adjusting Dehumidification Settings: Residential Use
- Adjusting Dehumidification Settings: Commercial Use
- Adjusting Ventilation Settings
- Ventilation Options
- Setting Preferences
- Cleaning the Thermostat Screen
- Adjusting Security Settings
- Viewing Dealer Information
- Advanced Features
- Installer Options
- Using the Temperature Display
- Using the Humidity Display
- Universal Outputs (U1, U2, U3)
- Universal Inputs (S1, S2, S3, S4)
- Data Logs
- Dry Contact Alerts
- Set Up the Dry Contact Alerts
- Staging Control
- Heat Pump and Backup Heat Operation
- Indoor Air Quality (IAQ) Control
- IAQ Reminders
- Customizable Reminders
- MicroSD card
- Commercial Features
- Overriding Schedules: Commercial Use
- Setting Holiday/Event Schedules: Commercial Use
- Setting Custom Events: Commercial Use
- Setting Holiday Schedule: Commercial Use
- Setting Holiday Override: Commercial Use
- Initiating Occupancy Mode: Commercial Use
- Ramp Rates (Commercial Use)
- Remote Setback (Commercial Use)
- Economizer and Time of Day (TOD) Operation
- Pre-Occupancy Purge
- Battery Replacement
- Optional Accessories
- Portable Comfort Control
- Remote Indoor Sensors
- Replacing a Thermostat
- Replacing an Equipment Interface Module
- Wiring
- Zoning
- Troubleshooting
- Regulatory Information
VISIONPRO
®
8000 WITH REDLINK™
31 68-0312—05
312 Outdoor Lockout
Heat Pump
Off
5° F to 60° F (in 5° F increments)
Off
(See Notes)
Both No ISU 312 Heat Pump Outdoor Lockout requires an
outdoor sensor.
Default is 40 F if ISU 201 Heating Equipment is
Air to Air Heat Pump and ISU 218 Backup Heat
Type is Gas/Oil.
Default is Off if ISU 201 Heating Equipment is Air
to Air Heat Pump and ISU 218 Backup Heat Type
is Electric.
Default is Off if ISU 201 Heating Equipment is
Geothermal or Geothermal Radiant.
Heat Pump Outdoor Lockout is optional for any
type of heat pump (Air to Air Heat Pump,
Geothermal Heat Pump or Geothermal Radiant
Heat).
See “Heat pump with outdoor temperature
lockouts” beginning on page 78.
312 Outdoor Lockout
Backup Heat
Off
5° F to 65° F (in 5° F increments)
Off Both No ISU 312 Backup Heat Outdoor Temperature
Lockout requires an outdoor sensor.
This ISU is only displayed if ISU 201 Heating
Equipment is Air to Air Heat Pump, Geothermal or
Geothermal Radiant and ISU 219 External fossil
fuel kit is set to No.
See “Heat pump with outdoor temperature
lockouts” beginning on page 78.
313 Radiant Cycles Per
Hour Stage 1
Note: “Stage 1" is
not displayed if
there is only 1 stage
of Radiant Heat.
1 to 12 CPH
3 Both No This ISU is only displayed when ISU 201 Heating
Equipment is Geothermal Radiant.
The thermostat automatically defaults to the
recommended setting for Geothermal Radiant
Heat (3 CPH).
Cycle rate limits the maximum number of times
the system can cycle in a 1 hour period measured
at a 50% load. For example, when set to 3 CPH, at
a 50% load, the most the system will cycle is 3
times per hour (10 minutes on, 10 minutes off).
The system cycles less often when load conditions
are less than or greater than a 50% load.
313 Radiant Cycles Per
Hour Stage 2
1 to 12 CPH
3 Both Yes This ISU is only displayed when ISU 201 Heating
Equipment is Geothermal Radiant.
The thermostat automatically defaults to the
recommended setting for Geothermal Radiant
Heat (3 CPH).
Cycle rate limits the maximum number of times
the system can cycle in a 1 hour period measured
at a 50% load. For example, when set to 3 CPH, at
a 50% load, the most the system will cycle is 3
times per hour (10 minutes on, 10 minutes off).
The system cycles less often when load conditions
are less than or greater than a 50% load.
Table 2. Installer Setup (ISU) Table. (Continued)
ISU
Number
Installer Setup
Name Settings Default
Residential,
Commercial
or Both
Requires
EIM Notes