VisionPRO 8000 Spec Sheet 2017
Table Of Contents
- Application
- Features
- Contents
- Specifications
- System Installation
- Installation Options
- Guidelines for Installing RedLINK Devices
- Installing Equipment Interface Module (if used)
- Wiring 24 Vac Common
- Selecting Discharge and Return Air Temperature Sensor Mounting Locations
- Installing Discharge and Return Air Temperature Sensors
- Selecting Thermostat Location
- Installing Wallplate
- Installing VisionPRO® 8000 with RedLINK™
- Wiring the Thermostat
- Remove Coin Cell Battery Tab
- Mounting Thermostat on Wallplate
- Power Optional RedLINK™ Accessories
- Performing Initial Setup
- Installer Tests
- Operation
- Setting the Time/Date
- Setting the Fan
- Setting System Mode
- Adjusting Program Schedules
- Overriding Schedules: Residential Use
- Overriding Schedules: Commercial Use
- Viewing Equipment Status
- Setting Vacation Hold: Residential Use
- Setting Holiday/Event Schedules: Commercial Use
- Setting Custom Events: Commercial Use
- Setting Holiday Schedule: Commercial Use
- Setting Holiday Override: Commercial Use
- Initiating Occupancy Mode: Commercial Use
- Remote Setback: Commercial Use
- Adjusting Humidification Settings
- Adjusting Dehumidification Settings: Residential Use
- Adjusting Dehumidification Settings: Commercial Use
- Adjusting Ventilation Settings
- Ventilation Options
- Setting Preferences
- Cleaning the Thermostat Screen
- Adjusting Security Settings
- Viewing Dealer Information
- Advanced Features
- Installer Options
- Using the Temperature Display
- Using the Humidity Display
- Universal Outputs (U1, U2, U3)
- Universal Inputs (S1, S2, S3, S4)
- Data Logs
- Dry Contact Alerts
- Set Up the Dry Contact Alerts
- Staging Control
- Heat Pump and Backup Heat Operation
- Indoor Air Quality (IAQ) Control
- IAQ Reminders
- Customizable Reminders
- MicroSD card
- Commercial Features
- Overriding Schedules: Commercial Use
- Setting Holiday/Event Schedules: Commercial Use
- Setting Custom Events: Commercial Use
- Setting Holiday Schedule: Commercial Use
- Setting Holiday Override: Commercial Use
- Initiating Occupancy Mode: Commercial Use
- Ramp Rates (Commercial Use)
- Remote Setback (Commercial Use)
- Economizer and Time of Day (TOD) Operation
- Pre-Occupancy Purge
- Battery Replacement
- Optional Accessories
- Portable Comfort Control
- Remote Indoor Sensors
- Replacing a Thermostat
- Replacing an Equipment Interface Module
- Wiring
- Zoning
- Troubleshooting
- Regulatory Information
VISIONPRO
®
8000 WITH REDLINK™
127 68-0312—05
Fig. 317. 2-Wire Zone Valve with end switch.
Fig. 318. Series 20 hot water heat.
Fig. 319. AQ2000 series panels or other hot water relay
panels.
Fig. 320. Heat pump with oil forced air backup.
TRANSFORMER
THERMOSTAT/EIM
R IS JUMPERED TO RH.
THE BOILER CONTROLS THE CIRCULATOR PUMP IN THIS SYSTEM.
BOILER
W W2 W3 Y Y2 G A
M31477
24
VAC
120
VAC
T
T
R
C
ZONE VALVE
TR
TH
END
SWITCH
1
1
2
2
TRANSFORMER
R IS JUMPERED TO RH.
1
THERMOSTAT/EIM
W W2 W3 Y Y2 G A
M34524
24
VAC
120
VAC
R
C
SERIES 20 VALVE
C
R(5) B(4) W(6)
1
TRANSFORMER
REMOVE THE JUMPER FROM RH TO RC WHEN USED WITH
AQ2000 SERIES PANEL.
1
THERMOSTAT/EIM
RC RH W W2 W3 Y2 G
M31479
24
VAC
120
VAC
R
C
HOT WATER RELAY PANEL
ZONE 1
RH
W
1
O/B
AUX1
AUX2
O
Y
Y2
G
R
C
L/A
TO THERMOSTAT
THERMOSTAT/EIM
HEAT PUMP
HEAT PUMP
M31480
1
RELAY
3
1
OIL FURNACE
T
T
THE BOILER IS CONTROLLING THE CIRCULATOR PUMP IN THIS DIAGRAM
Y2 USED WITH HEAT-PUMPS THAT HAVE 2 COMPRESSOR STAGES.
1
2
2