Install Instructions
29 65-0100—2
12
Q7800
13
14
15
16
18
17
19
20
21
22
G
L2
9
8
7
6
5
4
3
10
F
G
L2
9
8
3
7
M2525B
A
6
F
1ST STAGE
FUEL VALVE
2ND STAGE
FUEL VALVE
(OPTIONAL)
10
IGNITION
TRANSFORMER
FOR DIRECT SPARK IGNITION
(OIL OR GAS)
21
9
L2
GENERAL FOOTNOTES, SEE PAGE 5.
A
B
C
D
D
C
1234
78
15
B
5
7800 SERIES CONVERSION WIRING DIAGRAM
FROM________________________________ TO ______________________
(DEVICE TO BE MODERNIZED) (O.S. NUMBER OF RELAY MODULE TO BE USED)
L1&4
R4150H1002 RM7840G1014, OR RM7800G1018
Q520 SUBBASE TERMINAL 6 PROVIDED 60
SECOND MFEP. RM7840/RM7800
PROVIDE 30 SECONDS WITH Q7800
SUBBASE TERMINALS 19 TO 5 JUMPED
AND JUMPER JR2 CLIPPED.
JUMPER Q7800 TERMINAL 5 TO 18.
NOTE: 30 SECONDS WILL BE ADDED TO
PREPURGE TIMING.
LOCATE THIS JUNCTION
AND CONNECT IT TO
Q7800 SUBBASE
TERMINAL 6
LOCATE THE START INTERLOCKS AT THIS POINT AND
CONNECT IT TO Q7800 SUBBASE TERMINAL 20.
START INTERLOCKS NOW BECOME PREIGNITION
INTERLOCKS. IF START INTERLOCKS ARE NOT USED,
JUMPER Q7800 TERMINALS 4 TO 20.
LIMITS
CONTROLLER
START
INTERLOCKS
AIRFLOW
SWITCH
L1
3
4
11
12
10