User Guide
INCOMM L510 LAMP CONTROLLER USER GUIDE
31-00593-01 6
v1.5 October 26, 2022
c. Upon seeing the L510 startup, ENGINN will show a green check symbol indicating the bind was successful.
4. With the L510 bound and assigned its Room ID, PAN ID, and RF Channel, push its configuration from EngINN.
a. Click the Back to Summary button to return to the Device Summary screen.
b. Click the Write Configurations button. This will open the EngINN Task Manager, and you should see EngINN verifying
the L510 exists and begin to write the defined configurations to the L510.
c. EngINN will indicate the upload is completed.
5. Test the functionality of the L510.
Binding and configuring the L510 from an e7 or e7w Battery Powered
Thermostat
You can bind and configure the L510 with an e7 thermostat or e7w battery-powered thermostat if not using EngINN. Refer to
applicable commissioning documentation for the required L510 Address and I/O Map and the exact commissioning procedures.
1. Enter Service Parameter mode on the e7/e7w.
a. Press and hold °F|°C.
b. Press and hold MODE.
c. Press and hold FAN.
d. Release the three buttons.