User manual
3 - 25
4. For monthly scheduled operations, specify a day of the month (1 to 31) then enter the time.
For weekly scheduled operations, select a weekday from the drop down list then specify a time.
For daily scheduled operations, specify the time.
For one-time operations, enter the complete date in MM-DD-YYYY format (e.g., 12-31-2010), then
specify a time.
Note: Enter times in HH:MM format, using a 24-hour cycle. For example, 2:30 P.M. would be 14:30.
5. For push or flash operations, click Browse to select a file.
To schedule a pull operation, type a file name without a path in the Type Pull File Name field.
6. Select the check boxes next to the desired scanners or click Select All.
7. Click Schedule to save the schedule.
After a scheduled pull is successfully completed, ReM transfers the file to the ...Tomcat 6.0/scheduler/
GAConfigfiles folder on the web server.
If you schedule a push or flash operation, ReM copies the file you specify from the local host to ...\Tom-
cat 6.0\scheduler\GAConfigfiles folder on the server. When the scheduler starts, ReM copies this file
to the Program Files\JPOSScanner\GAConfigfiles folder on all clients involved in the scheduled oper-
ation.
A file containing information about executed scheduled operations is automatically generated on the
server in ...\Tomcat 6.0\scheduler\log\scheduler.log. However, if you are working remotely you can
save the scheduler log locally by clicking the Save Log button.
Scheduler Page Options
• Click Save Log to save a CSV file containing a list of all scheduled operations performed. The log
contains schedule date and time, type of operation, schedule description, IP address, scanner model,
serial number, file name, time the operation began, time it was completed, result, and Scheduler status.
• Click Schedule List to save a file listing all scheduled operations. The log includes the schedule
number, type of operation, processor, frequency, day of the week or day of the month for weekly and
monthly operations, time, file name, IP address, scanner model, and scanner serial number. See
Appendix C for more information about ReM Reports.
Deleting All Scheduled Operations
Click Delete All Jobs to erase all schedules.
Deleting One Scheduled Operation
To delete a single schedule:
1. On the web server, click Start>All Programs>Honeywell>Remote MasterMind>Stop Scheduler.
1. Open the file ...\Tomcat 6.0\schedules\schedule.txt using a text editor.
2. Delete the desired entry.
3. Save and close the file.
4. Click on Start>All Programs>Honeywell>Remote MasterMind>Start Scheduler.