User Guide
Table Of Contents
- 1. Safety
- 2. Receipt of delivery
- 3. Technical data
- 4. Installation
- 5. Commissioning
- 6. Fault tracing
- 7. SmartVFD Compact Application Interface
- 8. Control panel
- 9. General purpose application parameters
- 9.1 Quick setup parameters (Virtual menu, shows when par. 13.1 = 1)
- 9.2 Motor settings (Control panel: Menu PAR -> P1)
- 9.3 Start/stop setup (Control panel: Menu PAR -> P2)
- 9.4 Frequency references (Control panel: Menu PAR -> P3)
- 9.5 Ramps and brakes setup (Control panel: Menu PAR -> P4)
- 9.6 Digital inputs (Control panel: Menu PAR -> P5)
- 9.7 Analogue inputs (Control panel: Menu PAR -> P6)
- 9.8 Digital and analogue outputs (Control panel: Menu PAR - > P7)
- 9.9 Protections (Control panel: Menu PAR -> P9)
- 9.10 Autorestart parameters (Control panel: Menu PAR -> P10 )
- 9.11 PI control parameters (Control panel: Menu PAR -> P12 )
- 9.12 Easy usage menu (Control panel: Menu PAR -> P0 )
- 9.13 System parameters
- 10. Parameter descriptions
- 10.1 Motor settings (Control panel: Menu PAR -> P1)
- 10.2 Start/Stop setup (Control panel: Menu PAR -> P2)
- 10.3 Frequency references (Control panel: Menu PAR -> P3)
- 10.4 Ramps & brakes setup (Control panel: Menu PAR -> P4)
- 10.5 Digital inputs (Control panel: Menu PAR -> P5)
- 10.6 Analoque inputs (Control panel: Menu PAR -> P6)
- 10.7 Digital and analoque outputs (Control panel: Menu PAR -> P7)
- 10.8 Motor thermal protection (parameters 9.7 - 9.10)
- 10.9 Autorestart parameters (Control panel: Menu PAR -> P10)
- 10.10 PI control parameters (Control panel: Menu PAR -> P12)
- 10.11 Easy usage menu (Control panel: Menu PAR -> P9)
- 10.12 Fieldbus parameters (Control panel: Menu PAR -> S2 )
Honeywell Installation 23
4
4.2.5 Stripping lengths of motor and mains cables
Figure 4.9: Stripping of cables
Note! Strip also the plastic cover of the cables for 360 degree grounding. See Fig-
ures 4.4, 4.5 and 4.8.
4.2.6 Cable installation and the UL standards
To meet the UL (Underwriters Laboratories) regulations, a UL-approved copper ca-
ble with a minimum heat-resistance of 140/167 °F (+60/75 °C) must be used.
4.2.7 Cable and motor insulation checks
These checks can be performed as follows if motor or cable insulations are suspect-
ed to be faulty.
1. Motor cable insulation checks
Disconnect the motor cable from terminals U/T1, V/T2 and W/T3 of the frequency
converter and from the motor. Measure the insulation resistance of the motor cable
between each phase conductor as well as between each phase conductor and the
protective ground conductor.
The insulation resistance must be >1MOhm.
2. Mains cable insulation checks
Disconnect the mains cable from terminals L1, L2/N and L3 of the frequency convert-
er and from the mains. Measure the insulation resistance of the mains cable between
each phase conductor as well as between each phase conductor and the protective
ground conductor.The insulation resistance must be >1MOhm.
0.3 in
0.3 in
1.4 in
0.8 in
Ground conductor